About the Project

The project is spread over 90,000 square meters and includes the construction of a 7-story indoor parking lot designed to house 2,200 private vehicles and 30 bus parking spaces.

The project managed by the BIM method includes bridges, infrastructures, roads and tunnels.

The main execution stages so far include excavation and filling, the construction of the parking structure and the diversion of traffic to the north on the roof of the building.
The construction of the project is done using the conventional method, so far about 70,000 square meters of concrete blocks and about 66,000 cubic meters of concrete have been used.

In February, the first and central milestone in the project was completed, at the end of which the road was opened to traffic on top of the northern parking lot

Contact us for your next project

Read more